国产盗摄xxxx视频xxxx,麻豆一区二区99久久久久,国产丝袜美女一区二区三区,精品无码av无码专区

網(wǎng)站首頁(yè)技術(shù)中心 > CD-800 Dicing Machine               Instruction
產(chǎn)品目錄
CD-800 Dicing Machine               Instruction
更新時(shí)間:2013-07-29 點(diǎn)擊量:3611

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

亚洲熟妇丰满XXXXX| 久久国产色av免费观看| 丰满少妇作爱视频免费观看| 欧美又粗又硬又大免费视频Q| 亚洲妇女无套内射精| 人妻少妇看a偷人无码| 99国产精品久久久久久久日本竹| 人妻被按摩师玩弄到潮喷| 99久无码中文字幕一本久道| 久久亚洲av永久无码精品| 亚洲精品一区二区另类图片| 亚洲av之男人的天堂| 色欲av永久无码精品无码| 最近2019年中文字幕二页| 嗯灬啊灬把腿张开灬a片视频| 欧美性猛交xxxx免费看| 无码一区二区三区不卡AV| 亚洲av无一区二区三区| 色综合久久蜜芽国产精品| 欧美性猛交xxxx乱大交| 囯产精品一区二区三区线| 中文字字幕乱码视频| 极品尤物一区二区三区| 精品国品一二三产品区别在线观看| 国内精品人妻无码久久久影院导航 | 人人妻人人澡人人爽人人精品| 亚洲成A人一区二区三区| 日韩a人毛片精品无人区乱码| 亚洲熟妇无码八AV在线播放| 亚洲A∨精品一区二区三区下载| 欧美精品色婷婷五月综合| 十大色情禁片免费观看影片| 欧美性受xxxx| 中文字幕无码乱人伦| 中文字幕一区二区三区四区五区 | 久久精品人人做人人爽电影| 亚洲av午夜精品麻豆av| 免费看成人aa片无码视频吃奶| 色五月丁香六月欧美综合| 亚洲精品卡一卡2卡3卡4卡| 国产精品毛片av一区二区三区|